Pre-stressed box girders

i. Westshore Terminals: Surespan Structures provided replacement Box Girders for the original girders that were damaged in a marine accident. The girders were manufactured and replaced quickly to reduce downtime for the terminal facility.  Thirty five 60’ long Box Girders were replaced, each weighing up to 25,500 kg.
ii. Upper Harris: Surespan Structures supplied Box Girders which were 30m in length and required steering dollies to get them to their site.